How to Find Us During Construction
- contact835390
- Jul 9
- 1 min read
Updated: Sep 22
UPDATE 9/22/2024:
As of last week, the concrete barriers on Highway 55 that affect the intersections to and from our clinic have been removed. You are free to use normal routes for the time being (including turning left into our clinic on Dahlberg!). If you typically use Theodore Wirth Pkwy, concrete barriers are still present at that intersection, so it is still right turns only.
As we're sure you are aware, MNDOT seems to be having a particularly robust construction season this summer. Unfortunately, Highway 55 outside our clinic has popped up with some of this construction, and it may affect your route due to concrete barriers preventing crossing 55 as well as left turns onto or off of 55. This construction is currently scheduled to be present through October.

We will keep this blog post updated with instructions on how to reach us during construction. Google Maps and Apple Maps are in the process of updating to reflect these closures as well. Feel free to reach out if you have any questions.






Comments